質問 35
During concurrent development., a user reported a problem with Version 1 of the software product. A software quality engineer determined the problem originated m Version 2 of the product. Which of the following actions would be most appropriate for the software quality engineer to take first to fix the problem?

 
 
 
 

質問 36
Defect prevention should be initiated during the

 
 
 
 

質問 37
A sprint started with 354 requirements. As the sprint progressed, 14 requirements were introduced, 6 requirements were removed, and 28 requirements were changed. What was the requirements volatility for this sprint?

 
 
 
 

質問 38
Which of the following levels of control should be assigned when a software failure may result directly in a mishaps

 
 
 
 

質問 39
A software requirements specification (SRS) for software that is part of multiple systems should include which of the following elements?

 
 
 
 

質問 40
Which of the following metrics is included in earned value management?

 
 
 
 

質問 41
Which of the following corrective actions is the first action to take when a project experiences a significant deviation on baselined budgets, baselined schedules, or required quality levels?

 
 
 
 

質問 42
To increase the likelihood of the success of a software project, the project plan should meet which of the following requirements?

 
 
 
 

質問 43
One of the objectives of a functional test is to demonstrate that the software

 
 
 
 

質問 44
Which of the following is a responsibility of a lead auditor?

 
 
 
 

質問 45
In lean software development extra features should be identified as

 
 
 
 

質問 46
The Equity Theory states that for rewards to be motivational they must be distributed

 
 
 
 

質問 47
Which of the following tests should be conducted on software that will be used internationally?

 
 
 
 

質問 48
Results from a process audit show that the requirements group does not control changes to its software specifications. Which of the following basic requirements should be added to the software configuration management (SCM) policy?

 
 
 
 

質問 49
Under which of the following product requirements would the amount of work completed by a software system over a period of time be classified?

 
 
 
 

質問 50
Which of the following is the primary input to functional testing?

 
 
 
 

質問 51
The most compelling reason for automating test execution is the need to

 
 
 
 