74、A “road safety audit” is:

 
 
 
 

75、Criticism of another professional’s work is:

 
 
 
 

76、When calculating stopping sight distance, what does the AASHTO “Green Book” use as a deceleration rate?

 
 
 
 

77、On a road with a design speed of 50 mph and level grades, what is the AASHTO minimum stopping sight distance?

 
 
 
 

78、Under base conditions what is generally considered to be freeway capacity?

 
 
 
 

79、Violations of the rules of professional conduct should be reported to:

 
 
 
 

80、A traffic engineer is evaluating a freeway segment with a time mean speed of 60 mph and a variance of 25 mph². What is the space mean speed?

 
 
 
 

81、If a two-way arterial street is converted to a one-way arterial street, which of the following is LEAST likely to occur?

 
 
 
 

82、How is Space Mean Speed (SMS) defined?

 
 
 
 

83、On a freeway with a flow rate of 3,000 vehicles per hour and a space mean speed of 60 mph, what is the density of traffic flow?

 
 
 
 

84、A crash analysis reveals that a rural intersection has a crash rate of 80 crashes per 100 million vehicle miles.
The segment is 2.5 miles long, with an AADT of 10,000 vehicles per day over 3 years. How many crashes occurred?

 
 
 
 

85、The MUTCD requires that a “STOP HERE ON RED” sign be used when the stop line is offset from the intersection by more than:

 
 
 
 

86、For a signalized intersection, the ITE procedure recommends a yellow change interval based on a perception- reaction time of 1 second and a deceleration rate of 10 ft/s². For a 45 mph approach with a 60-foot intersection width, what is the minimum yellow change interval?

 
 
 
 

87、An intersection is STOP-controlled on the minor approach. The design speed of the major road is 50 mph.
The major road is 1 lane in each direction, terrain is level. What is the required intersection sight distance for a single-unit truck wishing to make a left turn onto the major road?

 
 
 
 

88、Yan, a consulting environmental engineer, discovers a garbage company employee dumping liquid into a stream, which is a violation of environmental regulation. After the yard manager dismisses her concerns, what is Yan’s most appropriate next step?

 
 
 
 

89、A road safety audit identifies a high-crash location due to inadequate lighting. The engineer proposes a countermeasure with a Crash Modification Factor (CMF) of 0.70. If the current crash rate is 10 crashes per year, what is the expected crash rate after implementation?

 
 
 
 

90、Per the AASHTO Roadside Design Guide, what is the preferred order for addressing a fixed roadside obstacle?

 
 
 
 

91、When is the receipt of compensation from more than one party for the same project ethical?

 
 
 
 

92、A professional engineer is offered a gift of event tickets from a contractor. Per the NCEES Model Rules, what should the engineer do?

 
 
 
 

93、Although crash involvement rates (crashes per 100,000 population) are highest for the five- to fifteen-year-old pedestrians, pedestrian fatality rates are highest for what age group?

 
 
 
 

94、For a lane group with two lanes on an approach to a signalized intersection, if the adjusted saturation flow rate is 1,700 vehicles/hour/lane and the effective time is 30 seconds out of a cycle length of 80 seconds, what is the capacity of the lane group?

 
 
 
 

95、A traffic engineer calculates an intersection sight distance of 750 feet for a left turn from a stop-controlled minor road onto a major road with a design speed of 55 mph. What is the AASHTO time gap used?

 
 
 
 